Sub-zero IC-27FI Bedienungsanleitung Seite 21

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 24
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 20
Integrated Installation 21
Installation Checklist
T
o ensure a safe and proper installation, the following
checklist should be completed by the installer to ensure
that no part of the installation has been overlooked.
INSTALLATION CHECKLIST
Have all packing materials been removed?
Turn the unit on. Is it operating properly?
Is the power cord plugged into a properly grounded
outlet, which has been installed in accordance with all
applicable electrical codes?
For units with an automatic ice maker, is the water
supply line connected and not leaking? Is the water
supply turned on and ice maker control on?
Has the anti-tip bracket been installed securely and
properly engaging the unit?
Is the unit leveled properly with all leveling legs making
contact with the floor? Has the kickplate/grille been
installed?
Are panels attached securely and properly aligned?
Has the door been aligned for proper appearance and
operation?
Does the customer understand the unit's operation?
Does the customer have the warranty package?
Have any installation or service problems been noted
on the product registration card? Has the registration
card been mailed in?
Have stainless steel panels been inspected for any
imperfections? This is to be done by the authorized
Sub-Zero dealer or installer with the customer, upon
completion of installation. Stainless steel panels are
covered by a limited 60-day warranty for cosmetic
defects.
subzero.com/specs
Seitenansicht 20
1 2 ... 16 17 18 19 20 21 22 23 24

Kommentare zu diesen Handbüchern

Keine Kommentare